18
Apr
MEP Design and Engineering for Carwash and C-Store in Moulton Parkway, Laguna Woods

InnoDez provided MEP Design and Engineering and Title 24 report for a new C-Store and Carwash located at 24202 Moulton Pkwy, Laguna Woods, CA. Existing Moulton Parkway Auto Spa will no longer be a full-service carwash. The below structures will be removed or replaced and relocated: Existing carwash/office building, detail

18
Apr
MEP Design and Title 24 for Four Dispensaries in San Francisco Bay Area and Fresno

InnoDez provided MEP Design (Mechanical, Electrical and Plumbing) and Title 24 Report for four (4) tenant improvements for Cannabis Retail Dispensaries in Fresno, Oakland, Larkin St., and California St. in San Francisco. All design were completed in less than 10 days since the client wanted them ready in a short

20
Mar
MEP Design and Title 24 Report for White Pines Lodge Restaurant at 864 Highway 4, Arnold

InnoDez Design and Engineering provided full set of MEP plans (Mechanical, Electrical and Plumbing) and Title 24 report for White Pines Lodge Restaurant at 864 Highway 4, Arnold, CA 95223. Scope of work includes: Remodel existing restaurant and bar at the first floor Remodel existing office and storage at second

09
Mar
MEP Design and Structural Engineering for True Light Christian Assembly Arcola, Texas

InnoDez designed and developed MEP and Structural Engineering for True Light Christian Assembly in Arcola, Texas. We worked hard with the Crosspointe Church Architects provide a high quality set of designs to fulfill Owner's requirements. The drawings were approved by the City and the project is in Construction phase now.

07
Mar
Structural Engineering and MEP Design for Mixed-Use Housing and Commercial Project in Moreno Valley, CA

Continental East Development Inc. awarded InnoDez Design and Engineering for designing Structural Engineering and MEP for phases II and III of a Mixed-Use housing and commercial project in Moreno Valley, CA. The project consists of three phases: Phase 1: 125 market rate apartments construction in process Phase II: 112 market