InnoDez provided full MEP Design and Engineering and Title 24 Report for a 19,509 SF Cannabis Cultivation Facility TI. Location
-
date: 25 Aug 2022
MEP Design, Structural Design and Engineering and Title 24 Report for ACE Hardware Alteration Project at Camarillo, CA
InnoDez provided MEP Design, Structural Design and Engineering and Title 24 Report for an alteration project for ACE Hardware store at 2520 Las Posas Rd
Camarillo, CA 93010.
Area size: 12,000 SF