InnoDez provided MEP Design and Engineering and Title 24 for existing parking conversion to ADUs. There are 20 proposed ADUs.
-
date: 01 Aug 2021
HVAC Design for New Single-Family Residence in Fowler, California
InnoDez provided HVAC design (Mechanical) for a new 6,500 SF Single-Family House in Fowler, CA 93625.
We provided our HVAC design based on the results taken from HVAC load calculations which was done by Elite Software.
We suggested using Franklin Split System Air Conditioner GXX16 and Goodman Gas Furnace GMVC96.